Laserfiche WebLink
r <br />i~~ ~ii~~~~~i~ni ti~~ <br />Tom Bird <br />King Coal Mine <br />4424 CR 120 <br />Hesperus, CO 81326 <br />January 16, 1999 <br />Subject: Correction to inspection report <br />Dear Tom, <br />~iECEIVED <br />JAN 2 8 1999 <br />~;ivision of Minerals & Geology <br />After reviewing the portion of the inspection report that discusses the slope of the gob <br />pile face I realized that you were correct. 1 had made a mistake in the text of my June <br />30, 1998 report and then automatically repeated that in the October 10, and most recent <br />report. The survey data is correct and as you pointed out the only area not at, or below, <br />the design slope of 2.5:1 is the lower right corner (looking up the slope). I have corrected <br />the most recent report and made reference to the error in the June and October report <br />as well. Thanks for catching my error. <br />Sincerely, <br />~7 <br />'bon R. ay, P.E. <br />735 East 7th Ave. <br />Durango, CO 81301 <br />970-385-7504 <br /> <br />