My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE51446
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE51446
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:55:31 PM
Creation date
11/20/2007 2:54:39 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Doc Name
SEDIMENTATION STRUCTURE PON 010
Section_Exhibit Name
TAB 13 ATTACHMENT 13-3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Provide an emergency spillway capable of passing runoff from the 100-year, 24-hour ~~ <br />storm event; <br />3. Provide adequate storage for sediment generated ae determined from the Sedcad+ <br />computer program. <br />4. Provide a nonclogging dewatering device and principal spillway that will provide <br />adequate detention time for the 10-year, 24-hour storm event and still allow a method <br />to dewater the pond down to the 100 percent sediment storage level in a reasonable <br />amount of time. <br />HW rology. The hydrology of the watershed was analyzed utilizing the SEDCAD+ confuter <br />program. SEDCAD+ is an enhanced PC version of the SEDIMOT II con~utez program written by <br />CSv11 Software Design of Lexington, Kentucky. Tab 13, Attachment 13-1, contains a listing <br />and desc rlptlon of the SEDCAD+ input va rl ables. In performing this analysis, the <br />characterSstlcs of the mineslte and reclamation procedures along with on-site sediment <br />control procedures were considered. Addendums A, B, and C contain a complete listing of <br />the SEDCAD+ Snpu[s and outputs for the 10-year, 25-year, and the 100-year design storms. <br />Table 13-3-1 contains the design hydrology summary. <br />TABLE 13-3-1 <br />DESIGN HYDROLOGY SU144ARY <br />POND 010 <br />Description 10-Y r, 29-Hr 25-Yr,24-Nr 100-Yr,2d-Hr <br />Precipitation Depth 1.7 Sn. 2.1 Sn. 2.5 in. <br />Inflow Runoff Volume 18.3 ac-ft 28.1 ac-ft 40.1 ac-ft <br />Pond Volume at Peak Stage 19.6 ac-ft 26.5 ac-ft 28.3 ac-ft <br />Peak Stage Elevation 6788.5 6790.6 6791.1 <br />Peak Inflow Rate 109.3 cfs 167.6 cfs 232.9 cfs <br />Peak Discharge Rate 29.0 cfs 113.5 cfs 169.9 cfs <br />Input consists of precipitation amount (inches), watershed area (acresl, time of <br />concentration (hoursl, runoff curve number (CN1, representative particle-size <br />distributions of soils Sn the area, sedlmentology information, spillway information, etc. <br />The drainage area for this sediment pond was measured on a 1"=400' topographic map (see <br />Exhibit 13-21. <br />13-3-2 Revised 09/OB/95 <br />
The URL can be used to link to this page
Your browser does not support the video tag.