Laserfiche WebLink
ti- <br />• ASSOCl~c'1teS <br />June 4a'. 2002 <br />Mr. Ron Roberts <br />Cripple Creek & Victor Gold Mining Company <br />P.O. Box 191 <br />1280 State Highway 67 <br />Victor CO 80860 <br />Golder Project No.: 003-2203 <br />RE: Summary No. 54: May 19 through June 1, 2002 <br />Cresson Project Phase IVa, b, and c Construction Quality Assurance <br />Deaz Mr. Roberts, <br />Golder Associates Inc. (Golder) is pleased to submit this summary of Phase Na, b, and c Construction <br />Quality Assurance (CQA) services performed for the Cresson Project during the period of May 18ei <br />through June 15`, 2002. <br />The weather during this reporting period was cleaz to cloudy. Approximate daytime low temperatures <br />ranged from 26° F to 53° F, and highs ranged from 45° F to 86° F. Snow was recorded on May 24a' and <br />light afternoon rain was recorded on May 31s` and June is ; 2002. Weather observations were made on <br />ten days of this fourteen-day reporting period. <br />Construction Synopsis <br />Ames Construction Inc. (Ames) of Aurora, Colorado is the earthwork contractor for the Phase IVa, <br />b, and c construction. Ames conducted Phase IVa, b, and c construction activities on ten days of this <br />fourteen-day reporting period (May 20a' through May 24's and May 28`s through June 1 S`) <br />Phase IVa <br />Ames did not place Structural Fill (SF) in the Phase Na area during this reporting period. Ames <br />conducted slope recontouring throughout the southern end of the Phase Na azea and continued final <br />subgrade prepazation. A Caterpillaz CS563C roller provided compactive effort, while a Mack water <br />truck provided moisture conditioning. <br />Ames continued to haul, place, and conduct fmal surface prepazations on Soil Liner Fill (SLF) in Phase <br />Na. SLF was hauled and placed above the 9575 road at the southern end of the Phase IVA azea. Ames <br />continued to conduct Depth Verification Testing completing test five through twenty-three. Ames <br />continued excavation of anchor trench azound the northeast end of Phase Na in prepazation for <br />Golder Associates Inc. <br />44 Union Boulevard, Suite 300 <br />Lakewood, CO 80228 <br />(303)980-0450 <br />(303)985-2080 <br />Golder Associates Inc. <br />