Laserfiche WebLink
Wllll~i <br />Associates <br />August 29, 2002 <br />Mr. Ron Roberts <br />Cripple Creek & Victor Gold Mining Company <br />P.O. Box 191 <br />2755 State Highway 67 <br />Victor CO 80860 <br />Golder Associates Inc. <br />44 Union Boulevazd, Suite 300 <br />Lakewood, CO 80228 <br />(303) 980-0450 <br />(303) 985-2080 <br />Golder Project No.: 003-2203 <br />RE: Summary No. 60: August 11 through August 29, 2002 <br />Cresson Project Phase IVa, b, c Construction Quality Assurance <br />Dear Mr. Roberts, <br />• Golder Associates Inc. (Golder) is pleased to submit this summary of Phase IVa, b, and c Construction <br />Quality Assurance (CQA) services performed for the Cresson Project during the period of August l ls' <br />through August 29s', 2002. <br />The weather during this reporting period was cleaz to cloudy. Approximate daytime low <br />temperatures ranged from 36° F to 56° F, and highs ranged from 71° F to 95° F. Rain was recorded <br />on August 19`", 2151, and 23`d, 2002. Weather observations were made on sixteen days of this <br />nineteen day reporting period. <br />Construction Synopsis <br />Ames Construction Inc. (Ames) of Aurora, Colorado is the earthworks contractor for the Phase IVa, b, <br />and c construction. Ames conducted Phase IVa, b, and c construction activities on sixteen days of this <br />nineteen day reporting period (August 12~' through August 16s' and August 19`s through August 29`"). <br />Phase IVa <br />Ames continued placement of Drain Cover Fill (DCF) and haul road construction in the Phase IVa <br />azea. The DCF was placed using CAT D6, D8, and D9 dozers. The DCF was placed on the floor and <br />slopes, advancing from north to south. DCF placement was completed on August 28's. <br />• Ames continued final grading of the Phase IVa diversion channel by grading subgrade according to <br />design drawings and placing 6-inches of low permeability channel lining fill. <br />