Laserfiche WebLink
i',;. \tccriuC Rccc~m •n:uler - nlinnr Rcvisinn 87-09 <br />I iailcr Itcinuval <br />n~<,~~„h~~„.„ <br />I<:nca: <br /> <br />? 13uildin~ Laborers = $ 29.50/hr <br />I Loader acrd Operator (track type) - $100.30/hr <br />I Haul T ruck and Operator = $ 51.5(1/hr <br />Total Labor and Cquipment Ratc $202.00/hr <br />f_stima[ed Hourly Production = 6525 vd3.hr <br />(based on past experience) <br />~~„lume <br />i\4eetin~ l"railer <br />Its48x12ft=6,912k 256 yd3 <br />356 vd3 - 65?5 yd3/hr x $202/hr = $793.00 <br />uvrrhead <br />10'% overhead = $ 79.00 <br />Total cost = $873.00 <br />Say = $870.00 <br /> <br />~J <br />MR 97-154 5 f0/Zi97 <br />