Laserfiche WebLink
CIRCES Cost Estimating Software <br />Agency or organization name :DRMS <br />Permit qr other job action :110c application review <br />Task description :Scale highwall for loose rock <br />HOURLY EQUIPMENT COST <br />State :Colorado <br />County :Archuleta <br />Site :Martinez <br />Permit/job # : M-2007-010 <br />Abbreviation :none <br />Filename :MO10-005 <br />Machine description :Cat 3458 L Series 11(2005) Horsepower : 321 <br />Weight (MT) : 46.57 <br />Cost Breakdown : Utilization <br />Ownership cost/hour : $63.20 NA Shift basis : 1 per day <br />Operating cosUhour : $77.00 100 Data source : (CRG) <br />Operatorcost/hqur: $32.96 ~ NA <br />Total unit cosUhour : $173.16 Total fleet cosUhour : $173.16 <br /> <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 278 LCY factor: NA volume : 278 LCY <br /> <br />Source of estimated volume :(300'L x 5'H x 5'D)/27 = 277.8 cy <br />Source of estimated swell factor :NA <br /> <br />HOURLY PRODUCTION <br />Excavator Cycle Time (load bucket swing loaded dump bucket. swing emote) <br />Basic job condition description : SEVERE <br />Secondary job condition within basic description : SEVERE <br />Cycle time value : 0.48 minutes <br />Bucket Capacity <br />Rated bucket capacity : 1.91 LCY (heaped) Bucket size class : small <br />Bucket fill factor : 0.68 Rock -Well blasted (60% - 75%) <br />Adjusted bucket capacity : 1.29 LCY <br />Job Condition Correction Factors Source <br />Site altitude : 7,150 feet Altitude adjustment : 1.00 ~ (Cat HB) <br />Job effciency adjustment : 0.83 (1 shiff/day) <br />Netjob correction : 0.83 multiplier <br /> <br />Unadjusted hourly unit production : 161.49 LCY/hour <br />Adjusted hourly unit production : 134.04 LCY/hour <br />Adjusted hourly fleet production : 134.04 LCY/hour <br />JOB 71ME AND COST <br />Fleet size : 1 excavator(s) Total job time : 2.07 hours <br />Unit cost : $1.292 per LCY Total job cost : $359 <br /> <br /> <br />L <br />