My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE51410
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE51410
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:55:30 PM
Creation date
11/20/2007 2:53:24 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2007010
IBM Index Class Name
Permit File
Doc Date
3/23/2007
Doc Name
Reclamation Cost Estimation
From
DRMS
To
Matt Carnahan
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Surface Blasting Work cont'tl Task # : 001 sheet 2 of 2 <br />BLASTING MATERIALS QUANTITIES ~ -_ QUANTITY UNIT <br />Total quantity of stemming required 1.63 ~ cubic yards <br />Total quantity of explosives required 1,278 pounds <br />Total quantity of del. cord/fuse/wire required 2,871 /in. feet <br />Quantity of blasting caps used per blasthcle 1 cap(s) <br />Total quantity of blasting caps required 100 caps <br />Quantity of primers used per blasthole 1 primer(s) <br />Total quantity of primers required 100 primers <br />Quantify of delays used per blasthole 1 delay(s) <br />Total quantity of delays required 102 delays <br />HOURLY EQUIPMENT COST Shiftbasis : 1 per day Data source : (CRG data) <br />Drilling equipment -Drill :Atlas Copco LM100A/YD90 <br />-Drill pad preparation :Cat 3458 L Series 11(2005) <br />Misc. drilling support equipment :+NA <br />Misc. explosives support equipment :~NA <br />Explosives delivery/prep. -Bulk truck :Water Tanker, 2,500 Gal. <br />- Cap truck: Water Tanker, 2;500 <br />Cost Breakdown : Drilling <br />Equipment Drill Pad <br />Preparation Misc. Drill Misc. Expl. <br />Support Support Explosives Delivery <br />Bulk Truck Cap Truck <br />Import data filename : airtools excavate NA NA misctruk misctruk <br />Utilization -machine+att. no. 1 : 100 25 NA NA 25 25 <br />-ripper or attachment no. 2 : NA NA NA NA NA NA <br />Equipment ownership $/hr : $12.98 $63.20 NA NA $7.50 $7.50 <br />Machine+att. 1 operating $/hr : $20.85 $19.25 NA NA $3.66 $3.66 <br />Ripper or att. 2 operating $/hr : $0.00 $0.00 NA NA $0.00 $0.00 <br />Operator+additionallabor$/hr: $38.52 $32.96 NA NA $19.67 $19.67 <br />Unit subtotals : $72.35 $115.41 $0.00 $0.00. $30.84 $30.84 <br />Number of units : 1 1 0 0 1 1 <br />Group subtotals : $72.35 $115.41 $0.00 $0.00 $30.84 $30.84 <br />Total work team cost/hour : $249.45 <br />MATERIALS COST <br /> Description ~ Unit Unit Cost Quantity Total Cost <br />Blasting agent : Bulk ANFO nom. density pound $0.202 1,277.78 $258.11 <br />Primers or boosters : Cast primer, 0.316 each $2.419 100.00 $241.90 <br />Blasting caps : Non-electric cap, inst. each $3.230 100.00 $323.00 <br />Det. cord, fuse or wire : Detonating cord, 10 gr./ft. linear foot $0.099 2,871.00 $284.23 <br />Delays : MS connectors each $4.116 102.00 $419.83 <br />Miscellaneous : Stemming, 1.5 in. gravel cu. yd. $23.00 7.63 $37.56 <br />Drill bits' : bit life = 1,400.0 linear feet $244.00 1.43 $348.57 <br />'bit life unit =linear foot, bit cost unit =each (per bit) Total materials cost : $1,913.21 <br />DRILLING AND EXPLOSIVES PREPARATION TIME <br /> Job Condition Correction Factors - Site altitude : 7,150 feet <br /> Altitude adjustment : 0.95 (DMG est.) <br />Total drilling length : 2,000 linear feet Job efficiency factor : 0.67 (Ch. Exc. HB) <br />Unadjusted drilling rate : 112.00 feef/hour Adjusted drilling rate : 71.29 feef/hour <br />Drilling time : 28.06 hours Explosives prep, time : 18.37 hours <br /> <br />JOB TIME AND COST Total job time : 46.42 hours <br />Total unit cost : $4.988 per cu. yd. Total jab cost : $8,314 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.