Laserfiche WebLink
COAL COMPANY QUARTERLY POND INSPECTION REPORT <br />Inspector Name: LA22Y F?~/. ~e.rc~ke Date: /-25- qs <br /> <br />Pond Number: ~ Date Last Inspection: ja-3-9 4 <br />site Name: ~/- Zc~~~e Quarter: F',~crF /q9s <br /> <br /> <br />1. Design Depth Measured From Spillway Invert 4, G <br /> <br />2.. Design Maximum Sediment Level Measured From Spillway Invert <br />2.~f <br /> _ <br />3. Sediment Level/Pond Bottom Measured From Spil]way Invert 2~9 <br /> <br />4. Water Level Measured From Spillway Invert ,,,ic.v e <br /> <br />5. Discharge Through Spillway Since Last Inspection ` Yes ~' No <br />6. Ri 11 s and Gullies Yes k' No <br />7. Vegetation Adequate X' Yes No <br />8. Outlet Channel Erosion Yes X' No <br />9. Animal Burrows Yes JC' No <br />10. Cracks Yes k No <br />11. Seepage i Yes ~ No <br />12. Spillway Clogged _. Yes k No <br />13. Valves Operational .!~/A Yes _ No <br />ADDITIONAL COMMENTS: iyoNt <br />MAINTENANCE REQUIRED: <br />- -- 4 <br />~ 0 <br />3 <br /> SPILLWAY SNV! <br />- --,--- <br />' <br />~ ~ p ~ Z <br />h <br />a ~ Q~ <br />h v y <br />R q W \ <br />.~1 <br />