Laserfiche WebLink
COAL COMA4NY QUARTERLY POND INSPECTION REPORT <br /> <br />Inspector Name: [-,a2R~ ~fi1. ~elr~,~o Date: ! - 2.f• 9S <br /> _ <br />Pond Number: ,S'- Date Last Inspection: /C~3 -94 <br /> <br />Site Namr.: ILS.~- o Ff~rz Quarter: F~2.rf ~iS <br /> <br />1. Design Depth Measured From Spillway Invert /. 2 0 <br /> <br />2. • Design Maximum Sediment Le vel Measured From Spillway Invert /, 0 0 <br /> <br />3. Sediment Level/Pond Bottom Measured From Spillway Invert 2. 2 <br /> <br />4. Water Level Measured From Spillway Invert _ ,y aye <br /> <br />5. Discharge Through Spillway Since Last Inspection Yes ~ No <br />6. Rills and Gullies Yes ~C No <br />7. Vegetation Adequate C Yes No <br />8. Outlet Channel Erosion - Yes _~C No <br />9. Animal Burrows Yes X No <br />10. Cracks _. Yes _~ No <br />11. Seepage ... Yes X No <br />12. Spillway Clogged __ Yes ~ No <br />13. Valves Operational X_ Yes _ No <br />ADDITIONAL COMMENTS: <br />MAINTENANCE REQUIRED: Nwi-c. <br />3 ~ ~p <br />V ~ {O Y <br /> spi~cw,ar rave <br />-~,--- - <br />~ ~ 2 d ~ ti <br /> ~ <br />W ay W W <br />~ <br />~ ~ h v R ~1 <br />