Laserfiche WebLink
Pa_y <br />iiiiiiiuiiiiiuiu <br />PEABODY COAL COMPANY <br />Western Dlvlslon <br />1300 South Yale <br />FlagslaH, Arizona 66001 <br />{602) 774-5253 <br />October 12, 1~91~nE1` ,~D <br />Mr. Carl Mount Qtr 15 1990 <br />Colorado Mined Land Reclamation Division Mined <br />1313 Sherman Street Suite 215 ReClarlt hand <br />Denver, Colorado 80203 ationDivisip~ <br />RE: Seneca II-W Pond 006 Slide - Abatement Plan <br />Dear Mr. Mount: <br />Attached please find two copies of the abatement plan for <br />Pond 006, including two final reports entitled <br />Geotechnical Investigation Pond 006 Slope Failure. This <br />plan satisfies the Step 1 requirement of NOV C-90-018. <br />Step 2, implementation of the plan, has been initiated as <br />per our discussion on October 9, 1990. CMLRD will be <br />notified when Step 2 has been completed. After <br />completion, the as-built road design for the realigned <br />section of the road, as shown on Exhibit 12-8 ME5, will be <br />submitted to CMLRD, <br />Ground Engineering Consultants, Inc, has been retained to <br />monitor the construction and provide a construction summary <br />report. <br />Should you have any questions regarding the attached, <br />please feel free to contact me. <br />jdc <br />Attachments <br />c: Fred Fest <br />Sincerely, <br />~/ ~ V <br />Tom Wainwright <br />Senior Engineer <br /> <br />