Laserfiche WebLink
• 2.02 GENERAL REQUIREMENTS FOR COAL EXPLORATION <br />2.02.1 Scope <br />The scope of this Section establishes requirements for coal exploration <br />outside an approved permit area and is intended in insure that such <br />exploration is conducted in a manner that protects the environment and <br />complies with the existing governmental regulations. These regulations <br />include filing notices of intent when 250 tons or less of coal will be <br />removed during exploration and applying for written approval when more <br />than 250 tons of coal will be removed during exploration. <br />Sunbelt, at this time, does not anticipate the need for coal <br />exploration; however, if at some future date exploration is necessary, <br />Sunbelt will comply with all requirements of this Section. Likewise, <br />Sunbelt would submit the appropriate information to the applicable <br />government agencies prior to the commencement of any coal exploration <br />• program. <br /> <br />2.02-1 <br />