Laserfiche WebLink
• BEAK <br />air for five minutes. Bit was moved to TD and blown slowly then <br />increased. Water vapor could be felt in tie return air. Some <br />water was present on the pipe when it was raised. It settled the <br />dust on the pipe but no flow. Therefore it was decided not to case <br />the hole due to the absence of water and the presence of only 100' <br />of casing. Hole was plugged with the cutting and the top 5' with <br />rock. WSC personnel will cement the surface. <br />• <br /> <br />-7- <br /> <br />