My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE51297
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE51297
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:55:26 PM
Creation date
11/20/2007 2:50:40 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041A
IBM Index Class Name
Permit File
Doc Date
9/20/2006
Section_Exhibit Name
Tab 14 Reclamation Plan
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tab 14 <br />RECLAMATION PLAN <br />Rule Description Page <br />2.05.4(2) Reclamation Plan ............................................. 14-1 <br /> List of Tables <br />14-1 Reclamation Soils Balances 8 Areas <br />14-2 Stockpile Volumes & Redistribution <br />14-3 Temporary Seed Mixture <br />14-4 Permanent Seed Mixture <br />145 1999 Vegetation Sampling <br />14-6 Permanent Seed Mix for 2 West Portals and South Fan <br />14-7 RDRDA Borrow Area -Quantity Calculation <br />14-8 Permanent Seed Mixture -Lowland and Upland Components <br />149 Permanent Seed Mixture -North Decline, Fall 1992 (Historical) <br />14-10 Permanent Seed Mixture -CRDA 2 8 3 (Historical) <br />14-11 Permanent Seed Mixture - Ute Water Disturbance, 2000 (Historical) <br />1412 Interseeding Seed Mixture -CRDA 2, November 2001 (Historical) <br />1413 Permanent Seed Mixture - (Historical) <br />1414 North Decline Interseeding <br />1415 Salt Tolerant Seed Mix <br /> List of Figures <br />141 Reclamation Timetable <br />142 Permanent Mine Seal <br />143 Permanent Drill Hole Seal <br />14-4 Refuse Pile Animal Habitat <br />145 RSDA South End Rirrap Ditch <br />146 Roadside South Portal Mine Water Discharge System <br />147 Roadside South Portal Dewatering Schematic <br />14-8 Mine Dewatering -Plan and Profile <br />149 Roadside South Portal -Mine Inflow Rate Determination <br />1410 North Decline Mine Discharge System -Flow Calculation <br />14-11 Siphon System -Flow Calculation without Siphon Influence <br />14-12 Debris Fin <br />14-13 Cameo Borrow Area No. 1 <br />List of Appendices <br />141 BLM-Proposal for Revegetation Research Project <br />142 Reclamation Plan Cost Estimate <br />143 Reclamation Costs, Cameo Refuse Disposal Areas No. 2 and other Areas <br />144 Other Reclamation Cost Estimates <br />14-5 Affected Land Owners Reclamation Approval <br />146 Final Reclamation Drainage Design <br />14-7 Revegetation Evaluation -Diversity <br /> List of Exhibits <br />RS-11-008 Roadside Mine Revegetation Field Trials of Refuse Pile <br />6C Roadside Mine-Post Mining Topography <br />7C Overland Conveyor-Post Mining Topography <br />8C Cameo No. 1 Mine-Post Mining Topography <br />9C Cameo Refuse Disposal Area-Post Mining Topography <br />10C Railroad Spur & Overland Conveyor-Post Mining Topography <br />11C Unit Train Loadout Facility-Post Mining Topography <br />12C North Decline-Post Mining Topography <br />13C North West Intake Post Mining Topography <br />(Rev 12/05) <br />
The URL can be used to link to this page
Your browser does not support the video tag.