My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO22237
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO22237
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:43:20 PM
Creation date
11/20/2007 2:50:17 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081
IBM Index Class Name
Hydrology
Doc Date
5/26/1998
Doc Name
HAYDEN GULCH TERMINAL INC PN C-92-081 QUARTERLY POND INSPECTION REPORTS
From
MONTGOMERY WATSON
To
DMG
Permit Index Doc Type
SEDIMENT POND INSPECTIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />HAYDEN GULCH TERMINAL, INC. <br />Hayden Gulch Loadout Facility <br />Permit No. C-92-081 <br />Quarterly Sedimentation Pond Inspection Report <br />Date of Inspection: March 17, 1998 Date Last Inspected: October 16, 1997 <br />Pond: Rail Loop Pond (Pond 002) Pond Location: SEl/4 SEl/4 Sec. 14, T6N, R88W <br />NPDES I.D. No.: COG-850008-002A Site Location: 2 mi. SE of Hayden, CO <br />Facility Configuration: Embankment Pond Owner's Rep: Tom Petrosky, Resident Agent <br />Water Level (above or below principal dewatering orifice): Above X Below 0.2 Ft <br />Sediment Level (below dewatering orifice [designated sediment level: > 4 Ft. <br />Sediment Removal Required: Yes No X <br />Outflow: 0.02 cfs <br />FEATURE PROBLEM COMMENTS <br /> YES NO <br />EROSION <br />Rills & Gullies on Embanment X <br />Wave Erosion X <br />Spillway Erosion X <br />Burrows X <br />Other X <br />STRUCTURAL <br />Differential Settling X <br />Cracks or Slides X <br />Seepage X <br />Other X <br />STRUCTURES <br />Principal Spillway <br />Clogged Orifice X <br />Clogged or Damaged Culvert X <br />Damaged Headgate X <br />Emergency Spillway <br />Erosion X <br />Riprap X <br />Clogged or Damaged Culvert X <br />Other X made uate freeboard <br />Maintenance Required: Pond embankment needs to be raised one (1) foot to ensure that sufficient <br />freeboard exists to meet the requirements of Rule 4.05.6(11)(e). Submitted <br />request to modify pond embankment in TR application dated October 31, 1997. <br />Maintenance Performed: None <br />Additional Comments: Water level about 2" above invert of combination spillway, estimated 3 - 4 feet <br />water depth. Appears that water level less than one (1) foot below top of <br />embankment crest. Pond surface ice covered. N facing inslope snow covered, <br />embankment crest about 50% free of snow. NPDES sample collected. <br />CDMG issued a proposed approval decision for TR-03 on F <br />Once weather conditions permit, operator will raise pond e: <br />foot. <br />NAME OF INSPECTOR: Tohn C. Weinman <br />r\861V'and,\I,M1QmnerPond°]'InryanonAp,dm <br />
The URL can be used to link to this page
Your browser does not support the video tag.