Laserfiche WebLink
<br />QUARTER 4 1998 POND 6 USAGE <br />USER DATE LOADS CAPACITY GALLONS LOCATION USED <br />CCBV 10/2/98 10 13,000.00 130,000.00 LEACH PAD <br />CCBV 10/3/98 8 13,000.00 104,000.00 HAUL ROADS <br />CCBV 10/7/98 2 13,000.00 26,000.00 HAUL ROADS <br />CCBV 10/8/98 5 13,000.00 65,000.00 HAUL ROADS <br />CCBV 10/9/98 6 13,000.00 78,000.00 HAUL ROADS <br />CCBV 10/10/98 7 13,000.00 91,000.00 HAUL ROADS <br />CCBV 10/11/98 7 13,000.00 91,000.00 HAUL ROADS <br />CCBV 10/15/98 2 13,000.00 26,000.00 HAUL ROADS <br />CCBV 10/16/98 4 13,000.00 52,000.00 HAUL ROADS <br />CCBV 10/17/98 6 13,000.00 78,000.00 HAUL ROADS <br />CCBV 10/18/98 4 13,000.00 52,000.00 HAUL ROADS <br />CCBV 10/22/98 8 13,000.00 104,000.00 HAUL ROADS <br />CCBV 10/23/98 7 13,000.00 91,000.00 HAUL ROADS <br />CCBV 10/24/98 6 13,000.00 78,000.00 HAUL ROADS <br />CCBV 10/29/98 6 13,000.00 78,000.00 HAUL ROADS <br />CCBV 11/20/98 5 13,000.00 65,000.00 HAUL ROADS <br />CCBV 11/26/98 1 13,000.00 13,000.00 HAUL ROADS <br />TOTAL 1.222.000.00 <br />