Laserfiche WebLink
QUARTERLY POND INSPECTION REPORT <br />THE PITTSBURG & MIDWAY COAL MINING CO. <br />EDNA MINE <br />Pond Identification: C1-IECK DAM #13 <br />Type Of Pond: EARTHEN CHECK DAM STRUCTURE <br />Operational Status At Time of Inspection <br />Approximate Water Level: ESTIMATED 0 5 FT BEl<QW DISCHARGE LEVEL <br />Sediment Level (9'0) Total Storage ESTIMATED 20%~I L <br />Outflow (cfs): N N <br />Features <br />Status <br />Comments <br />Erosional: <br />Rills & Gullies On Embankment ok <br />Vegetation ok <br />Outlet Channels ok <br />Other <br />Pond Structure: <br />Settling ok <br />Cracks Or Slides ok <br />Seepage ok <br />Other <br />Appurtenant Structures: <br />Primary Spillway ok <br />Secondary Spillway No Secondary Spillway <br />Other <br />Additional Comments: <br />Structure appeared To be competent and functioning properly. <br /> <br />Inspected By: <br />Steve Linse <br />Date: September 27, 1999 <br />~, ~A'~ <br />