Laserfiche WebLink
• 6. Comprehensive Inspection <br />One of the individuals identified in Sa above will inspect <br />the stormwater management controls at least twice each year <br />in the spring and fall. The inspection will note if any <br />sediment structures or features require maintenance. The <br />inspection will also note the condition of any outslopes and <br />if rill repair or any supplemental seeding is required. <br />7. Record Reepinu and Internal reporting procedures <br />A written form will be kept at the mine site to document the <br />comprehensive inspections. The report will be reviewed with <br />the Mine Manager, if maintenance is required, to assure the <br />maintenance is scheduled and preformed. <br />8. Consistency with Other Plans <br />A copy of the SPCC plan is include with this SWMP. A copy of <br />both the SWMP and the SPCC plan will be available at the <br />mine office. <br />9. Allowable Non-Stormwater Discharges <br />There are no sources of irrigation return flow, natural <br />• uncontaminated spring water, mine drainage, or process water <br />that are combined with stormwater discharges. <br /> <br />• <br />11 <br />