Laserfiche WebLink
<br /> <br />• reconstructed according to the postrnining land use needs, the topography and the <br />• vegetation requirements of the restored plant communities. Fertility evaluations will be <br />' performed, and amendments will be applied as needed. <br />• ~outempotaneous Rev~tation - Revegetatioo operations will be performed as <br />' contemporaneously as is practicable. Seedbeds will be properly prepared and seeding <br />expeditiously perfomred to ensure that maximum germination and seedling establishment <br />are realized. Mulches or other surface treatments will be applied as needed to provide <br />' temporary stability and to promote seedling germination and establishment Both <br />temporary and permanemt revegetation operations will be timely performed. The level and <br />types of operations to be performed will be determined by the nature of the revegetation <br />objectives and goals. For example, planting temporary stabilization mites will entail less <br />' planning and work than will be necessary for permanent revegetation plantings. <br />Judicious use of the procedures and practices outlined above will allow American Soda to <br />' minimize disruption to the environment during development, ongoing operations and final <br />reclamation of areas disturbed for solution mining. <br /> <br /> <br /> <br /> <br /> <br />1 <br /> <br />1 <br />1 <br /> <br /> <br /> American Soda. LLP. 1-2 <br /> Soil Conservation. Fiostoo and Sedimem <br /> Control, Ralamatioo, and Revegelatioo Ran <br />' Oc[obcr 2& 1998 <br />