Laserfiche WebLink
Central Appalachia Mining, LLC <br />Water Sampling Report <br />Date: 12-06-05 <br />Weather Conditions: Overcast - 24 degrees F. <br /> Surtace Water <br />Sample <br />Point Time Flow <br />cfs H <br />p EC <br />umhos/cm Tem C <br />p ~ ~ <br />SW-1 2:40 PM 0.3 8.0 4400 1.5 <br />SW-2 2:45 PM Dry - - - <br />SW-3 12:16 PM Dry - - - <br />SW-4 11:20 AM Dry - - - <br />SW-5 2:45 PM D - - - <br />SW-6 2:09 PM " 'Dry ~ - - - <br />SW-7 1:51 PM Dry - - - <br />SW-8 8:31 AM 0.3 7.8 4400 1.0 <br /> <br /> Ground Water <br />Sample <br />Point Time SWL <br />feet H <br />p EC <br />umhos/cm Tem C <br />p ~ ~ <br />GW-1 11:41 AM 9.8 8.1 6300 10.1 <br />GW-3 12:23 PM 38.8 7.5 4200 10.2 <br />GW-6 2:11 PM Dry-18.8' - - - <br />Location of Points/Wells <br />SW-1 East Salt Creek above McClane under haul road bridge <br />SW-2 McClane Creek at culvert below mine <br />SW-3 Munger Creek at haul road culvert below mine <br />SW-4 East Salt Creek -2 miles downstream of SW-8 <br />SW-5 McClane Creek above mine site at culvert inlet <br />SW-6 Munger Creek below mine before north split <br />SW-7 Munger Creek above Mine <br />SW-8 East Salt Creek between Munger and McClane Creeks at bridge <br />SW-X McClane Creek at confluence with East Salt Creek <br />Fourth Quarter 2005 <br />Sampled by: Jim Stover <br />Meters Calibrated: Yes <br />GW-1 Alluvium of East Salt Creek about 3 Miles above McClane - TD 14.3' <br />GW-3 Alluvium of East Salt Creek just below Munger Canyon - TD 47.3' <br />GW-6 In Munger Canyon at the permitted waste rock disposal area - TD 18.8' <br />Feet <br />GW-1 Total Depth 14.3 <br />GW-3 Total Depth 47.3 <br />GW-6 Total Depth 18.8 Depth revised when pipe was damaged <br />during gob pile construction. <br />