Laserfiche WebLink
HOURLY PRODUCTION sheet 2 of 2 ~~ <br />Hauling Capacity <br />Scraper Payload (weiphtl Basis : Scraper Bowl (volume) Basis <br />Material weight : 2,550 pounds/LCY <br />Material description <br />Earth -Dry packed <br />Rated payload <br />Payload capacity <br />48,000 pounds <br />Struck volume : 14.00 LCY <br />Heaped volume : 20.00 LCY <br />Average volume : 17.00 LCY <br />Adjusted capacity : 17,00 LCY "' <br />18.82 LCY "' hourly protluction reflects volume per scraper pair on push-pull models <br />Cycle Time : Job Condition Corrections : Site altitude (ft.) : 5,255 <br /> Scraper Push dozer Source <br />Scraper loading time ` : 0.90 minutes Altitude adj.: 1.000 NA (Cat HB) <br />Maneuver and spread time : 0.60 minutes Job efficiency : 0.830 NA (Cat HB) <br />'load time per scraper pair on push-pull models Net Correction : 0.830 NA <br />Travel lime <br />Road condition description :Rutted dirt, little maintenance: no water, 2" tire penetration <br />Haul Route <br />Seg. # Haul distance (feet) Grade (%) Roll. res. (%) Total res. (%) Velocity (fpm) Travel time (min.)" <br />1 400 15.00 5.00 20.00 556 0.73 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />"travel time for each segment is adjusted for acceleration/tleceleralion. Retnm time : 0.19 <br />