My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE51247
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE51247
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:55:25 PM
Creation date
11/20/2007 2:48:46 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2007042
IBM Index Class Name
Permit File
Doc Date
8/14/2007
Doc Name
Cost Summary Form
From
DRMS
To
File
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ ~ ~`~ <br />P JECT IDENTIFICATION <br />ate : 14-Aug-2007 Permit or job no.: M-2007-042 <br />User : KAP Abbreviation : none <br />Filename : M042-000 <br />Agency or organization name :Colorado Division Of Reclamation Minin <br />Permit or job action :New <br />State :Colorado <br />_ County:Montrose <br />And Safety <br />IASK USt IDIREGTCOST51 FORM FLEET TASK DIRECT <br />NO. TASK DESCRIPTION USED SIZE HOURS COST <br />001 -High-wall reduction dozer 1 21.4 $3,537 <br />002 -Replace overburden scraped 2 4.1 $2,362 <br />003 -Rip area ripper 1 6.87 $1,180 <br />004 -Replace topsoil scraped 2 5.8 $3,306 <br />005 -Revegetation revege 1 5.0 $2,992 <br />006 -Mobilize/Demobilize mobilize 1 5.0 $3,163 <br /> SuaTOTALS: 48.41 $16,540 <br />'includes inflation factor adjustment oC NA % TOTAL DIRECT COST' _ $16,540 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT- Llablllty lnSUranCe: 2.02 %Of dlreCt total= $334 <br />Performance bond : 1.05 % of direct total = $174 <br />Job superintendent : 24.20 hrs'...$/hr: $39.38 total = $953 <br />Profit: 10.00 %ofdirect total= $1,654 <br />"assume net hours = 50% of task hours TOTAL O & P = $3, 115 <br />LEGAL-ENGINEERING-PROJECT MANAGEMENT- CONTRACT AMOUNT (tlirectt0&P)= $19,655 <br />Financial warranty processing (legallrelated costs) : 500.00 total $ NA total = $500 <br />Engineering work and/or contract/bid preparation : 4.25 % of cntr. NA total = $835 <br />Reclamation management and/or administration : 5.00 % of cntr. NA total = $983 <br />CONTINGENCY- NA' NA total= NA <br />'contingencies accounted for at task level TOTAL INDIRECT COST= $5,433 <br />,~' : ,D ~Qr-,S <br />~~ ~~ <br />Site :H/S Properties Pit <br />TOTAL BOND AMOUNT (direct + indirect) _ $21,973 <br />
The URL can be used to link to this page
Your browser does not support the video tag.