Laserfiche WebLink
_ PERIODIC INSPECTION FORM <br />Water, Sediment, or Slurry Im <br />p <br />ou <br />n <br />dments <br />INSPECTOR'S NAME: Dennis Jones / <br />' <br />^ <br />l <br />DATE: (~ ' a G ` ~ Z <br />NPDES I.D. NO.: CO-0000221 D.P. 008 <br /> <br />FACILITY CONFIGURATION: Cross-Valley Pond <br />DATE LAST INSPECTI C~ <br />ON: ~ ~~ D '~ <br />SITE NAME: Pond #008 LOCATION: SW`/9 NW`/<. Sec. 7, TSN, R86W <br />MZNE NAME: Seneca II Mine (Seneca Coal Co) LOCATION: 7.1 mi. SE of Hayden, CO <br />MINE I.D. NO.: CMLRD Permit No. C-80-005 OWNER'S REP.: Grea g Kitchen, Gen Mar <br />Circle Or Write in appropriate response <br />1. Foundation preparation (removal of vegetation, stumps, topsoil: Yes <br />2. Lift thickness: 12 <br />3. Compaction according to approved plan: Yes <br />4. Burning (specify extent and location): No <br />5. Angle of slope: 3:1 upstream, 3:1 downstream Total = 6:1 <br />6. *Seepage (specify location, color, and approximate volume) <br /> From underdrain pipes: <br /> At isolated points on embankment slopes: Yes No N/A <br /> At natural hillside: Yes No N/A <br /> Over widespread areas: Yes No N/A <br /> From downstream foundation area: Yes NO N/A <br /> "Boils" beneath stream or ponded water: Yes No N/A <br />7. Cracks or scarps on crest: Yes No N/A <br />8. Cracks or scarps on slope: Yes No N/A <br />9. Sloughing or bulging on slope: Yes No N/A <br />10. *Major erosion problems: Yes No N/A <br />11. Surface movements in valley bottom or on hillside: Yes No N/A <br />12. *Erosion of toe: Yes No N/A <br />13. *Water impounded against toe: Yes No N/A <br />14. Existing embankment freeboard: (normal = 8.0') $-~ feet <br />15. Increase Decrease in water level: b.v c ~a tig Q <br />' feet <br /> ~ <br />16. Cracks, bul in <br />g g, or erosion on upstream face: Yes No N/A <br />17. Visible sumps or sinkholes in slurry surface: N/A <br />18. *Clogging <br /> Spillway channels and pipes: Yes No N/A <br /> Decant system; <br /> Diversion ditches: NL <br />19. *Cracking or crushing of pipes <br /> Spillway pipes: Yes No N/A <br /> Decant system; N A <br /> <br />20. Trash racks clear and in place: Yes No N/A <br />*Major adverse changes in these items could cause instability and should be reported to the <br />Engineering Manager and Mine Superintendent for further evaluation. Adverse conditions noted in <br />these items should normally be described (extent, location, volume, etc.) in the space on the <br />back of this sheet. <br />