Laserfiche WebLink
PERIODIC INSPECTION FORM <br /> Water, Sediment, or Slurry Impoundments <br /> ' ~ ~-~~~~ 0 Z <br />INSPECTOR S NAME: Dennis Jones DATE: <br />NPDES I.D . NO.: CO-0000221 D.P. 002 <br /> '7 <br />~-~ 6' O Z <br />FACILITY CONFIGURATION: Incised Pond DATE LAST INSPECTION: <br />SITE NAME : Wadae Impoundment #002 LOCATION: NNP/a NE'/a, Sec. 34, T6N, R87W <br />MINE NAME : Seneca II Mine (Seneca Coal Co) LOCATION: 7.1 mi. SE of Havden, CO <br />MINE I.D. NO.: CMLRD Permit No. C- 80-005 OWNER'S REP.: Grea4 Kitchen, Gen Mar <br />Circle or Write in aAAropriate response <br />1. Foundation preparation (removal of vegetation, stumps, topsoil: <br />2. Lift thickness: <br />3. Compaction according to approved plan: NLA <br />4. Burning (specify extent and location): <br />5. Angle of slope: upstream, downstream Total = <br />6. *Seepage (specify location, color, and approximate volume) <br /> From underdrain pipes: <br /> At isolated points on embankment slopes: <br /> At natural hillside: <br /> Over widespread areas: N/A <br /> From downstream foundation area: N A <br /> <br /> "Boils" beneath stream or ponded water: Yes No N/A <br />7. Cracks or scarps on crest: <br />8. Cracks or scarps on slope: <br />9. Sloughing or bulging on slope: <br />10. *Major erosion problems: Yes No N/A <br />11. Surface movements in valley bottom or on hillside: Yes No N/A <br />12. *Erosion of toe: <br />13. *Water impounded against toe: <br />14. Existing embankment freeboard: N/A feet <br />15. Increase Decrease in water level: IAO G~n la~ feet <br />16. Cracks, bulging, or erosion on upstream face: NL <br />17. Visible sumps or sinkholes in slurry surface: N A <br />18. *Clogging <br /> <br /> Spillway channels and pipes: Yes No N/A <br /> Decant system: <br /> <br /> Diversion ditches: Yes No N/A <br />19. *Cracking or crushing of pipes <br /> Spillway pipes: NL <br /> Decant system: N/A <br />20. Trash racks clear and in place: N A <br />*Major adverse changes in these items could cause instability and should be reported to the <br />Engineering Manager and Mine Superintendent for further evaluation. Adverse conditions noted in <br />these items should normally be described (extent, location, volume, etc.) in the space on the <br />back of this sheet. <br />