Laserfiche WebLink
<br /> <br />COAL COMPANY QUARTERLY POND INSPECTION REPORT <br />Inspector Name: CA/1/LV /~el~.~,~o Date: 7•Z6 •9f <br /> <br />Pond Number: 9 Date Last Inspection: Q •27-94 <br /> <br />Site Name: ~I R~/} Quarter: ~„ems 9q <br />1. Design Depth Measured From Spillway Invert . <br />2. Design Maximum Sediment Level Measured From Spillway Invert <br />3. Sediment Level/Pond Bottom Measured From Spillway Invert ~./ <br />4. Water Level Measured From Spillway Invert Nu,vt <br />5. Discharge Through Spillway Since Last Inspection Yes ~ No <br />6. Rills and Gullies Yes ,1' No <br />7. Vegetation Adequate ~ Yes No <br />8. Outlet Channel Erosion _ Yes ~ No <br />9. Animal Burrows Yes ~ No <br />10. Cracks Yes ~ No <br />11. Seepage -Yes _~ No <br />12. Spillway Clogged Yes ~~ No <br />13. Valves Operational ~ Yes No <br />ADDITIONAL COMMENTS: Nevi <br />MAINTENANCE REQUIRED: .yo,vt <br />- - 4 F <br />W; ~~ ~ <br />3 ~ r~ <br /> SPILLWAY SNV! <br />- -}~- - - - <br />~ ~ Z V ti <br /> ~ ~ q <br />. ~ <br />W w ~ W q <br />w <br />~ h v N ~ <br /> . 1 <br />