Laserfiche WebLink
<br /> <br />COAL COMPANY QUARTERLY POND INSPECTION REPORT <br />Inspector Name: ~A/2/~Y /let cake Date: ,7 _'i<6 - 9 5I <br /> <br />Pond Number: 4 Date Last Inspection: q•22-9y <br />Site Name: /UOR ~ ~on fr ~t - ~A2d Quarter: ~ii/L~ 9 4 <br /> <br />1. Design Depth Measured From Spillway Invert /, ps' <br /> <br />2. Design Maximum Sediment Level Measured From Spillway Inv ert /, y p <br />3. Sediment Level/Pond Bottom Measured From Spillway Invert Z. ~ <br /> <br />4. Water Level Measured From Spillway Invert ~/o,ay <br /> <br />5. Discharge Through Spillway Since Last Inspection Yes ~ No <br />6. Rills and Gullies Yes --~ No <br />7. Vegetation Adequate ~~ Yes No <br />8. Outlet Channel Erosion Yes ~ No <br />9. Animal Burrows Yes ~ No <br />10. Cracks Yes _~ No <br />11. Seepage Yes X No <br />12. Spillway Clogged Yes ~ No <br />13. Valves Operational ~ Yes No <br />ADDITIONAL COMMENTS: <br />MAINTENANCE REQUIRED: <br />- - ¢ S <br />W W D <br />3 ~ ri° <br />SPILLWAY INVERT J _ <br />~- -- <br />~ ~ 2 V Q Q 1 <br />W W <br />W W W O o W~ Q <br />O h ~ A FFRRRRII <br />