Laserfiche WebLink
~, ,.~ • IIIIIIIIIIIIIIIIIII i <br />COAL COMPANY QUARTERLY POND INSPECTION REPORT <br />Inspector Name: LARK y ~~/r ~~c[ Date: 7- Z 6 ~qg <br /> <br />Pond Number: / Date Last Inspection: d- 22-99 <br /> <br />Site Name: NTC-Naa1/i Quarter: Tti~~d 99 <br /> <br />1. Design Depth Measured From Spillway Invert Q,2 S' <br /> <br />2. Design Maximum Sediment Level Measured From Spillway Inv ert /, (fB <br />3. Sediment Level/Pond Bottom Measured From Spillway Invert 3• L <br /> <br />4. Water Level Measured From Spillway Invert ~t/a.vr <br /> <br />5. Discharge Through Spillway Since Last Inspection Yes y No <br />6. Rills and Gullies Yes k' No <br />7. Vegetation Adequate ~ Yes No <br />8. Outlet Channel Erosion Yes i No <br />9. Animal Burrows Yes ~ No <br />10. Cracks Yes X No <br />11. Seepage Yes ~ No <br />12. Spillway Clogged ... Yes ~ No <br />13. Valves Operational i/.A. Yes No <br />ADDITIONAL COMMENTS: <br />MAINTENANCE REQUIRED: <br />- - 4 F - <br />W W 0 <br />W <br />3 ., ri° <br /> SP/[[WAY INVE <br />- -~--- -- <br /> 2 <br />~ ~ " <br />~ ~ ~ Q <br /> <br />O W <br />h V t o h <br />A m <br />~ <br /> ``~ <br />