Laserfiche WebLink
6. Industrial Activity: Descatbe the primary industrial activities which take place on site. Include the type of tacilrty~(underground mine, surface mine, <br />etc.) plus a brief description of the nanue of the business and the industrial processes used Include a of the mining and roal preparation <br />processes where applicable. (The applicant may want m submit a process tbw sheet) <br />The Carbon Junetan Mise h au inactive surface coal mice that is wrxatly ie final recbmatioa. Final redamatim activities include <br />bae~lline and eradiae of the Dit and sacillarv sctivity areas. retoosoiliae of the disturbed areas. sad revettefs6on of the divNrtied <br />areas in accordance with the CDMC miaine sod reclamsdoa Derma. <br />7. Indicate whether an expknamry, active mhrhrg, inactive mining, or post mining operation or is the sore in temporary cessation, <br />CurtestW the site is m final reclamatioD. Final reclamation is aeticisated to be comDlNed by December 2005. <br />Ifexpbretory, please submit any knowv water quality/quantdy data relative m the discharge(s) end the receiving sneam(s) that reflect the wndilions <br />prior to the present activity, the length of tbne the activity is expected m be order exporation and describe what activities wr71 take place during <br />exploration that could have as impact on the quantity or the quality of the discharge. If post mining, describe areas affected and extent of reclamation <br />completed and length of tie elapsed since revegetatinu ocerured. Also, specify whether any outfalLs previousty described salve, partially or tota0y, a <br />rectainted area. lnclude expected bond release date. <br />8. Produetioa: Lis[ the principal product(s) Produced and current and mmt'vnum production rates. <br />Coal was the Drinciwl uroduct Droduced from the Carbon JuactiOD Miue. There 14 Do curreDt aroductios. No aaSlalned brie term <br />production occurred during the life otthe mine, iheretore there was no established meaimum Drodudtos rate. <br />9. Is this a seasonal operation? No X Yes U Y~+e. please fiat the months of operation. <br />I0. fatermitieat Discharges: Except for storm ronot~ are any of the discharges described in item 2I hrtermitrent or seasonal? <br />No Yes If Y_ev describe the frequency, duretioo and fbw rote of each discharge occnrresce. <br />NotAoaliable. Stortarvaoftoaly. <br />11. Location Map: A Sts:11 ioe6 location map designating the facdhy property, intake pohris, discharge points, each of its hazardous waste treatment <br />storage or disposal facilities, areas in post mbrhrg, each well where fluids from the facdity are injceted underground, those wells, springs, other surface <br />water bodies and drinking water wells cseea in public records or otherwise known to the apptiwnt and the receiving waters shall be submitted The map <br />sha0 extend one mr7e beyond the property boundaries. The map shall be form a 7ir or 15 minute llSGS quad sheet, or a map of comparabie scale. A <br />north snow shall be shown. A Luger map may be included for reference $the permittee wishes. <br />THE MAP MUST BE ON PAPER S;SX 11 MCFIE4 OR PROCESSBtlG OF YOUR PERMrr Wa,L BE DELAYED . See Attached London MaD <br />12. Site Map: A 8h z 11 inch map of the sine shall be submitted showing facility feaurres (whenever possrbk;) such as bur7dmgs, ponds, diversion d@ches, <br />stream locations, numbered discharge points, sampl'mg and flow moDitoring points, land application mess, stockpiles, waste rock P~ mP~d Piles, <br />krcatbn of trench dm'ars and/or spoils springs, crasher mess, mine drainage tbw paths, domestic wastewater treament plants, power punts, Huck <br />washing mess, explosive storage areas; parking lots, vehicle maintenance areas, chemical storage ateas, etc. The outfalls shall be Ltbeted to correspond <br />with the numbers fisted hr item 21. A Ltrger map maybe included for reference ff the permaree wishes. <br />THE MAP MUST BE ON PAPER 8 t4X 11 INCHES OR PROCPSSINC OF YOUR PERMn•wn.L BE DELAYED . See Attached Sit! MeD <br />13. Water Balance: ADach a Ihre drawing showing all weber flow through mrd from the mine/pnpatation plant sites Indicffie sources of intake water, <br />operations contributing wastewater m the effluent, and trntarent unSts labeled to cetrespond to the more detm7ed destxiptions in item 21. Construct a <br />water balmrce on the line drawing by showing average flows between intakes, operations, treatinent units and outtalk. ff a water balance cannot be <br />de[erinined, provide a pictorial description of the nature and amount of any sources of water and any collection or treauent measures. If not applicable; <br />please hrdicaro. <br />Not ADDlinbk. No process water used. <br />