Laserfiche WebLink
DoG . ~~ I~-~/-~8 ~ III IIIIIIIIIIIIIIII <br />• <br />Rule 2.0.5.5 - Postminine Land Uses <br />(1) Surface Coal Minin>? Activities <br />{a) Each plan shall contain a detailed narrative of the proposed use, followin¢ reclamation of <br />the land within the proposed permit area. In accordance wilt land use categories established in the narrative, the <br />plan shall include a discussion of the utility and capaciri~ of the reclaimed land to support a variety of alternative <br />uses, and the relationship of the uroposed use to existing land use policies and plans. This description shall explain. <br />(i) How the proposed posunining land use is to be achieved and the necessary support <br />activities which may be needed to achieve the proposed land use; <br />(ii) Where a land use different from the premining land use is proposed, all materials <br />needed for approval of the alternative use under 4.16; <br />(iii) The consideration which has been given to making all of the prouosed surface coal <br />mining and reclamation operations consistent with surface owner plans and programs; and <br />(b) The description shall be accompanied by a cow of the comments concerning the proposed <br />use by the legal or equitable owncr of record of the surface of the proposed permit area and the State and local <br />government agencies which would have [o initiate, implement, approve. or authorize the proposed use of the land <br />following reclamation. <br />(c) A map prepared [o the standards of 2.10 shall accompany [he plan. <br />• RESPONSE <br />TCC is requesting approval for an underground mine with this permit revision application. Therefore, the <br />requirements of this Section are not applicable to the Foidel Creek operation. Details regarding postmining land <br />uses at the Fish Creek Tipple, which is a surface operation, are enumerated within the Fish Creek Tipple Appendix, <br />Volume VII, Rule 2.05.5(1). <br />{2) Underground Mining Activities <br />a) Each plan shall contain a detailed narrative of the proposed use, following reclamation of <br />the land to be affected by all surface operations and facilities within the proposed permit area. In accordance with <br />the land use categories established in the narrative, the plan shall include a discussion of the utility and capacity of <br />the reclaimed land to support a variety of uses and the relationship of the prouosed use to existing land use policies <br />and plans. The description shall explain <br />(i) How the proposed posunining land use is to be achieved and [hc necessary support <br />activities which may be needed to achieve the proposed land use: <br />(ii) Where a land use different t}om the premising land use Is proposed, all materials <br />needed for approval of the alternative use under 4.16: and <br />(iii) The consideration which has been ~icen to making all of the proposed surface <br />mining activities consistent with surface owncr clans and applicable State and local land use plans and programs. <br />(h) The description shall be accompanied by a cop+ of the comments conccrniug the proposed <br />use by the legal or equitable owncr of record of the surface of the proposed permit area and the State and local <br />government agencies which would have to initiate, implement, appro+e. or authorize the proposed use of the land <br />APP@dCaV~~ APRl 4 2000 <br />Permit Renewal No. 3 2.05-123 4/1/99 <br />