Laserfiche WebLink
Allen Mine <br />Sedimentation Pond 005 <br />Summary of Calculations <br />Contributing Areas: <br />Runoff Storm Intensity <br />Area 'Acres 10Yr-24Hr 10Yr-Peak (IPH) <br />005-1 3.1 0.47 2.84 <br />Sediment Detention: <br />60~ Sediment load: 0.06 Ac-Ft per acre requires O.tg Ac-Ft <br />1009 sediment load: 0.10 Ac-Ft per acre requires 0.31 Ac-Ft <br /> Volume Surface <br />• <br />Storage Ac-Ft Acres Elevation <br />t <br />Bottom Pond - 0.07 7,450.0' <br />60~ Sediment 0.19. 0.12 7,452.0' <br />100% Sediment 0.12 0.14 7,453.0' <br />Runoff 0.47 0.21 7,456.0' <br />To Spillway 0.22 0.23 7,457.0' <br />Top of Pond - - 7,459.0' <br />TOTAL 1.00 <br />Emergency Spillway: <br />The. spillway will pass a 25-Year, 24-hour storm <br />event. A one-foot freeboard will be maintained. <br />1 1 ~-~ ~ <br />.~ _ _. <br />