Laserfiche WebLink
C 1, lC- <br />• III III'lllllllll III <br />STATE OF COLORADO <br />OFFICE OF THE STATE ENGINEER <br />Division of Water Resources <br />Department of Natural Resources <br />1313 Sherman Street, Room 818 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3581 <br />FAx: (303) 866-3589 <br />stCEIVED <br />arcs ~ o zooo <br />OF COQ <br />titi <br />we <br />• ~ t8l6 ~ <br />hnp://water state.co.us/default. htm <br />Division at Mi, <br />.'S~nl°9Y <br />Response to Reclamation Permit Application Consideration <br />TO: Carl B. Mount, Senior Environmental Protection Specialist <br />CC: Division 1 Office; District 1 Water Commissioner <br />FROM: Kevin G. Rein, Water Resource Engineer <br />DATE: August 30, 2000 <br />RE: Pioneer Farm Pit, File No. M-2000-080 <br />Section 34, Twp 4 S, Rng 64 W, 6th P.M., Arapahoe County <br />Operator: Pioneer Sand Company, Inc. <br />Contact: Pioneer Sand Company, Inc. <br />5000 Northpark Dr., Colorado Springs, CO 80933 <br />(303)340-1440 <br />Bill Owens <br />Governor <br />Greg E. Watcher <br />Executive Director <br />Hal D. Simpson, P.E. <br />Slate Engineer <br />CONDITIONS FOR APPROVAL <br />X The proposed operation does not anticipate exposing groundwater. Therefore, exposure of <br />ground water must not occur during or after mining operations. <br />^ The proposed operation will consume ground water by: ^ evaporation, ^ dust control, ^ <br />reclamation, ^ water removed in the mined product, ^ processing, ^ other <br />Prior to initiation of these uses of ground water, the applicant will need to obtain either a <br />gravel pit or other type of well permit, as applicable. However, prior to obtaining a permit, <br />an approved water supply plan or decreed plan for augmentation is regwred. <br />^ Prior to approving a well permit, the applicant must conduct a field inspection of the site and <br />document the locations of all wells within 600 feet of the permit area. The applicant must <br />then obtain a waiver of objection from all well owners with wells within 600 feet of the permit <br />area or request a hearing before the State Engineer. <br />^ Other: <br />COMMENTS/NOTES: <br />