My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE51104
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE51104
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:55:20 PM
Creation date
11/20/2007 2:45:19 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082A
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Doc Name
AS BUILT REPORT SEDIMENTATION STRUCTURE POND 010
Section_Exhibit Name
TAB 13 ATTACHMENT 13-3A
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Peak estimated stage elevation with the passage of the 25-year storm is 6789.84. This <br />• leaves d.2 fee[ o£ freeboard to the top of embankment. <br />Please refer to Addendums 13-3A-A, 13-3A-B, and 13-3A-C for capacities of both spillways <br />during passage of the 10, 25, and 100-yea[ storm events. Table 13-3A-5 presents the as- <br />built details fo[ [he p[Sncipal and emergency spillxay. <br />TABLE 13-3A-5 <br />As-Built <br />Principal and Emergency spillxay Data Summary <br />Sediment Pond 010 <br /> Principal spillxay: <br /> Type Riser Inlet ICMPI with <br /> 6^ orifice <br /> Inlet Elevation 6784.0 <br /> Length 131 feet <br /> Diameter 36" riser with a 24" <br /> barcel (6" orifice) <br /> Slope 5.8 9 <br />• 10-ir, 24-Hr Peak Stage 6787.54 <br /> Emergency Spillway: <br /> Type Trapezoidal Channel <br /> Channel Protection Rock riprap 6 Mirafi 600X <br /> geotextlle <br /> Bottom Width a feet <br /> Minimum Depth (w/freeboard) 1.25 feet <br /> Length 40 feet (embankment) <br /> Side Slopes 3:1 <br /> Inlet Elevation 6787.6 <br /> 25-year, 24-hour Peak Stage (estimate) 6789.8 <br />Summary <br />The capacity of Sedimentation Pond 010 Ss attributed partially to the embankment and <br />partially to the pond excavation. Ouring passage of the 10-year, 24-hour storm the <br />spillway does not discharge sediment doxnstream nor is there any flow through the <br />emergency spillway. In addition, the spillway is designed to safely discharge the 25- <br />year, 24-hour storm event. <br />13-3A-9 Revised 08/30/96 <br />
The URL can be used to link to this page
Your browser does not support the video tag.