My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE51040
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE51040
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:55:19 PM
Creation date
11/20/2007 2:44:05 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981020A
IBM Index Class Name
Permit File
Doc Date
5/13/2002
Section_Exhibit Name
Appendix H MSHA Plans Deleted from Current Permit
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
himself beyond the last permanent or temporary roof support that <br />has previously been set. If,tests are necessary beyond the last <br />~' permanent or temporary support. then probes shall be used. All <br />_> <br />tests will be performed with MESA approved methane detectors. <br />_ E. Methane Control in Outby Areas <br />1. "The methane content in any return aircourse other than an aircourse <br />returning the split of air from a working section (as provided in <br />Sections 75.309 and 75.310 30 CFR 75) shall not exceed 2.0 volume <br />per centum. The methane content in the air in active workings shall <br />be less than 1.0 volume per centum. If at any time the air in any <br />active working contains 1.0 volume per centum or more of methane, <br />changes or adjustments shall be made at once in the ventilation in <br />the mine so that the air shall contain less than 1.0 volume per <br />centum of methane." <br />2. Present plans are based on developing two to five entry headings for <br />the purpose of exploration and development. No mining is now planned <br />whereby a worked section of the mine is to be abandoned and isolated <br />from the active workings of the prospecting or exploration entries. <br />Since no pillaring is anticipated, there is no request for permis- <br />sion to ventilate these areas. <br />3. If explosion-proof seals or bulkheads are required, the seals shall <br /> be constructed in the following manner: <br /> (a) Solid 8" x 8" x 16" concrete blocks are to be used with an <br /> average compressive strength of 1800 psi, using ASTM C-140-70 <br /> ': standards. <br /> (b) Recesses (hitches) at a depth of 16 inches are to be cut in the <br /> ribs and floor for the installation of the 8° x 8" x 16" con- <br /> Crete blocks in order to prevent possible movement. No recess <br />-7- <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.