Laserfiche WebLink
:} <br />~ CAMAS America, Inc. <br />Support Services Group-Denver Region <br />3609 South Wadsworth Boulevard Suite 300 Lakewood Colorado 80235 <br />Telephone (303) 980-2424 Facsimile (303) 980-8002 <br />August 11, 1994 <br />Mr. Berhan Keffelew <br />Environmental Protection Specialist <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />RErEI~~~o <br />AUG 15 1994 <br />e[VISt000ti1unein,~.. U,;O;UO~~ <br />CAMAS <br />RE: Final Adequacy Concerns, Longmont Operation, DMG File No. M94-027 <br />Dear Mr. I{effelew: <br />Per our phone discussions of August 9-10, 1994, I am responding to your verbal <br />request for clarification and/or commitment on two final adequacy concerns to our submitted <br />DMG application referenced above. <br />1. You have requested that I explain why a berrn should not be required along the <br />eastern edge of Boulder Creek which is the western edge of our mining boundary <br />along the length of our mining operation. 'There are several reasons: <br />a) Obviously the fast being, "What purpose would a berm serve?". Our gravel <br />plant location is on the highest ground available and there will be minimal <br />and heavy or well anchored equipment located within the pit. 'Therefore, any <br />flood waters from Boulder Creek entering our pit will do little damage to our <br />equipment and would cause no offsite impacts. <br />b.) Placing a substantial berm within the 100 year floodway or flood-prone area <br />may cause substantial offsite impacts, such as: <br />l.) forcing floodwaters west towards a nearby house causing increased <br />damage to their property, <br />2.) increasing flow velocity dovmstreatn by wnstrcting flow, due to the <br />berm, which could cause downstream erosion and increased <br />property damage to downstream residences, <br />3.) Causing the berm itself to erode increasing downstream sedimentation <br />and water quality problems. <br />c.) 'The Corps of Engineers, who have jurisdiction over Boulder Creek, may not <br />want a berm within the flood area of Boulder Creek ' =`- for the reasons stated <br />under b.). <br />d.) We have dedicated a 50 ft. riparian setback wne to maintain a corridor for <br />wildlife movement along Boulder Creek and to leave existing cottonwood trees <br />and willows. Placing a berm in this area would destroy this purpose. <br />t~ _ _ <br />~ III IIIIIIIIIIIII III <br />999 <br />Bituminous Roadways Cooley Gravel Company Flanagan Ready-Mia Limired <br />Lakewood Colorado Lakewood Colorado Denver Colorado <br />