My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE51011
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE51011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:55:18 PM
Creation date
11/20/2007 2:43:32 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983039
IBM Index Class Name
Permit File
Doc Date
5/23/1983
From
LAS ANIMAS CNTY PLANNING AND LAND USE OFFICE
To
RECLAMATION SPECIALIST
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />2 <br />Reclamation Plan <br />Y~ ~ <br />The site has suitable t~yl remaining for establishment <br />of grass species. The slopes on the North-side'of the <br />pit need to be sloped to no greater than 4:1. There is <br />a small drainage that runs between the two excavation <br />areas. This drainage needs to be sloped to no greater than <br />4:1. After the sloping is completed 39 to 40 lbs. of <br />available nitrogen per acre will be applied. <br />Seeding of this site will be done using a grass drill. <br />The species seeded will be Pastura Little Blue stem at <br />3.5 lbs. pure-live-seed per acre and Vaughn sideouts <br />grama at 4.5 lbs. pure-live-seed per acre. Seeding will <br />be done in June to ensure good survival and establishment <br />of the seeded species. <br />After the seeding operation is completed the site will be <br />mulched with 4000 lbs. of native hay or straw per acre. <br />This mulch will be mechanically anchored using a disc. <br />Weed control on the seeding will be done as necessary for <br />a minimum of 2 yrs. following the seeding. The weeds <br />will be mowed when they reach a height of 4 inches. <br />Grazing or other uses will be restricted for a minimum of <br />2 years following the seeding. <br />All work shall comform to SCS standards and specifications <br />for critical area treatment, mulching and seeding. <br />
The URL can be used to link to this page
Your browser does not support the video tag.