Laserfiche WebLink
• No travel of unauthorized vehicles will be allowed on anything other <br />than established roads. Employee and mine vehicles and other haulage <br />equipment will be restricted only to the haul and access roads. <br />Crushing, Handling and Loadout Facilities. The coal from the Peacock <br />Coal Mine will be transported from the mine via a conveyor. A conveyor <br />will discharge the coal into a crusher which will reduce the coal to an <br />approximate 2" x 0" size. Once crushed, the coal will be fed onto <br />another conveyor belt and discharged into a coal stockpile. The coal <br />from the stockpile will be loaded into highway trucks for transport to <br />market. The coal handling, crushing and Loadout diagram for the Peacock <br />Coal Mine is shown on the Drainage and Sediment Control Plan Map (Map <br />6). <br />Coal dust from th.e existing coal crushing and Loadout facilities along <br />Hay Gulch has not been a problem because of infrequency of strong winds <br />in the vicinity of the Sunbelt operation. If coal dust becomes a <br />• problem at the planned storage piles, the water truck from the mine will <br />be available for suppression. No thermal dryers are to be used at the <br />facilities. <br />Disturbance. Because Sunbelt will be mining coal from an underground <br />operation, the area of land affected for surface operations and <br />facilities within the permit area will be minimal. <br />Reclamation of the surface operations and facilities within the permit <br />area will commence as contemporaneously as possible after mining <br />operation is completed. The mine water truck will be available to keep <br />any dusty conditions under control. Strong or excessive winds are not <br />commonplace in the vicinity of the Sunbelt operation; therefore, <br />planning of any special windbreak vegetation will not be undertaken. <br />Blasting. Because Sunbelt is conducting an underground mining <br />operation, no surface blasting will be undertaken as part of the <br />• operation. <br />2.05-40 <br />