Laserfiche WebLink
• Coal Handling Structures <br />The description of the coal crushing, handling, and load-out facilities <br />for the Sunbelt operation is found under the Mine Facilities section in <br />2.05.3. The location of these facilities is shown on the Drainage and <br />Sediment Control Plan Map (Map 6). <br />Coal Processing Waste and Non-Coal Processing Waste <br />This part is not applicable. Sunbelt uses a dry crushing facility for <br />coal preparation; no coal processing waste, as defined in Rule 1.04, <br />"DEFINITIONS", is produced from any part of the mining operations. <br />Underground Development Waste <br />Sunbelt does not plan to deposit any underground development waste on <br />the surface. Therefore, the requirements of this Section are not <br />• applicable. <br />Return of Coal Processing Waste to Abandoned Workings <br />This part is not applicable. No coal processing waste, as defined in <br />Rule 1.04, "DEFINTIONS", is produced from any part of the Sunbelt mining <br />operations. <br />LJ <br />2.05-20 <br />