My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE51005
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE51005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:55:17 PM
Creation date
11/20/2007 2:43:28 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981040
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
RULE 2.05 OPERATION AND RECLAMATION PLANS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.05 APPLICATION FOR PERMIT FOR SURFACE OR UNDERGROUND <br />MINING ACTIVITIES -- MINIMUM REQUIREMENTS FOR <br />OPERATION AND RECLAMATION PLANS <br />2.05.1 Ob.iectives <br />The objectives of this Section are to ensure that the Division is <br />provided with comprehensive and reliable information on the planned <br />surface and coal mining operations, and to ensure that those operations <br />will be allowed to be conducted in compliance with the Colorado Rules <br />and Colorado Surface Coal Mining Reclamation Act, Article 33 of Title <br />34, as amended, Colorado Revised Statutes of 1973. <br />2.05.2 Operation Plan - Estimated Area for Life of Operation <br />Sunbelt plans to permit the area for the first five years of operations. <br />Planned underground mining will involve approximately 11 years of mining <br />at the anticipated annual average production rate of 50,000 tons of coal <br />• per year. For purposes of this application, although Sunbelt is only <br />requesting a five year permit term, the mining and reclamation plan <br />identifies all mining within the A Coal Seam. Sunbelt will submit <br />information regarding the detailed mining plans with future 5-year <br />permits. Details of the operational plan are delineated in Section <br />2.05.3. <br />Sunbelt will employ detailed and current engineering design for all <br />underground mining activities in order to maximize recovery. Methods of <br />coal recovery are set forth in Section 2.05.3. <br /> <br />2.05-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.