Laserfiche WebLink
1o3oso-ooo <br />West Pueblo Gravel Mine -Transit Mix of Pueblo <br />Seeepage Calculations <br />Lyman Henn Inc. <br />Defined Standard Flow throuah Bedrock <br />Design Performance <br />q (cfdf) 0.0015 q (cfdf) 0.0045 q=flow rate per unit area <br />Area (sf) 4449213 Area (sf) 4449213 Area=total area of bedrock <br />Q (cfd) 6674 Q (cfd) 20021 Q=total flow rate <br />Q (gpm) 35 Q (gpm) 104 V=total volume in 90-days <br />V (acre-ft) 90-days 13.8 V (acre-ft) 90-days 41.4 <br />Defined Standard Flow throuah Compacted Embankment <br />Desian Performance <br />q (cfdf) 0.03 q (cfdf) 0.09 q=flow rate per unit area <br />Area (sf) 175691 Area (sf) 175691 Area=total area of slurry wall <br />(Z (cfd) 5271 Q (cfd) 15812 Q=total flow rate <br />Q (gpm) 27 Q (gpm) 82 V=total volume in 90-days <br />V (acre-ft) 90-days 10,9 V (acre-ft) 90-days 32.7 <br />For 90-dav Liner Test <br />(must meet Performance Criteria) <br />Design Standard Flow (gpm) 62 <br />Performance Standard Flow (gpm) 188 <br />Design Standard 90-day Volume (acre-ft) 24.7 <br />Performance Standard 90-day Volume (acre-ft) 74.0 <br />