Laserfiche WebLink
~i <br /> <br />• <br />Appentllz i.3-4; Drilling, Completion, end Sampling Techniques <br />Drilling and Mell Completion <br />Description of the shallor hole drilling end completion can be <br />found In Appentllz 3.3-3. <br />Bedrock holes ^ere Core drilled to depth, using synihetlic <br />drilling muds end occasionally, only water, During times o+ <br />lost clrculnt ion, bentonite mud and lost circulation material <br />rare used. The notes rare then ge oDhyslcelly logged. Tne <br />completion strings consisted of a section of pert ore+e0 <br />(1 /4-inch holes on 1 foot centersl 1-Inch steel pipe, a 30-inch <br />Inf letiDle packer, end 1-Inch steel pipe to the surface. All <br />pipe lengths were meeeured t0 the nearest .D1~ to insure that <br />the packer ras placed et the desiretl Interval. A calculate0 <br />volume of cement was then placed Dy use of a tremmie DiDe by <br />upward displacement. The packers remained Inflated until ine <br />Cement plug had set. All cement plugs were verified by use of <br />the iremmie pipe for tagging. <br />In the case of SK-3H, cement could not De placed rlin any <br />certainty because o1 the hole being horixontel, In this Hole, <br />two DaCkers rare Installed t0 provide monlfOring of three 20ne5. <br />A pressure regulator is being USed t0 melntdin pressure in the <br />packers. Tne peckers have remaine0 Inf toted 90f Of the time <br />during the last 2 years. Ne have had problems rich the brass <br />fittings expanding end contracting severely during the spring <br />and fall and deflating ine packers for short time periods. <br />These deflation times are Indicated on the data sheets. <br />Sampling <br />All nonfloring rolls rare develOpetl rith air upon Completion. <br />Floring rolls rare alloyed fo tree 41or for several hours, <br />removing many tens of casing volumes. Tro to three casing <br />volumes rare removed rlth a PVC bailer (nonfloring yells), when <br />practical, prior to sampling. All containers, Inclutling the <br />bailer rare rinsed rlth the rater to De sampled and distilled <br />rater betreen sampling sites. Callbretetl pH entl conductivity <br />meters end thermometer rare used to measure field parameters at <br />each site. A 100 fiberglass tape rlih a plopper ras used to <br />measure rater levels to the nearest .01~. The Collected rater <br />sample ras field filtered through .45 micron membranes end <br />placed In sample bottles, containing acid preservatives <br />supplied Dy the lab (one nitric, one sulphuric, one blank). <br />These bottles rare then plated In en tCe chest to maintain <br />temperatures Just above freezing. Samples rare delivered to the <br />lab for analysis rltnln 24 to 36 hours otter removef 7rom the <br />ground. <br />Analyses have Deen performed Dy Industrial Lebs of Denver during <br />the entire project. Industrial Lebs uses EPA accepted testing <br />• <br />