Laserfiche WebLink
r_ _ <br />E~~.4 FtECE1V ED <br />s Coal Company _., n 4 9DUy <br />Seneca Coal Com <br />v~ ~ - <br />pivision ~t MMatets and paolo9Y <br />October 10, 2005 <br />RE: Seneca II-W Mine (C-82-057) Quarterly Stockpond Inspections <br />Mr. Daniel Mathews <br />Division of Minerals and Geology <br />101 South 3rd, Suite 301 <br />Grand Junction, CO 81501 <br />Dear Mr. Matthews: <br />Enclosed are copies of the third quarter 2005 Stockpond inspections for <br />those structures at Seneca II-W which have been constructed to date. <br />Inspections for Stockponds T-1, T-2, T-3, T-5, T-18, T-20, T-22 and T- <br />24 are included. <br />Should you have any questions, please do not hesitate to call. <br />Sincerely, <br />~~~- <br />Roy Karo <br />Reclamation Manager <br />Enclosure(s) <br />cc. Mr. Michael Boulay <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203-2273 <br />Seneca Coal Company • P.O. Box 670 • Hayden, Colorado 81639 <br />Telephone (970) 276-3707 • FAX (970) 276-3014 <br />