Laserfiche WebLink
Western Ener2v Comoanv <br />Rosebud Mine (Montana) <br />Date: June 13, 1996 <br />Agency: Montana Departmem of Environmental Quality <br />Violation No. 96-03-02: Ground water level data was not collected from 384 monitoring wells at <br />the frequency stated in the approved ground water monitoring schedule. <br />Fine assessment: $900.00 <br />Temtinatiom August 12, 1996 <br />Date: July 28, 1997 <br />Agency: Montana Departmem of Emironmeotal Quality <br />Violation: No. 97-03-01: Implemented an tmapproved minor revision by regrading to an <br />unapproved postmining topography plan; resoiling; and reseeding; and for failure to <br />notify the Departmem within 10 days of a regrading problem. <br />Abatement: 1). Receive approval of pending PMT revision <br />2). Remove soil and recontour in accordance with approved revision <br />3). Submit Curren[ topography widen 30 days of regrading and prior to soiling. <br />Fine assessment: $1,000.00 <br />Temtinatiou: Pending. <br />Date: June 30, 1998 <br />Agency: Montana Department of Envuo®ental Quahry <br />Violation: No. 98-03-01: Exceeded the MPDES limit for total settleable solids at four traps in SMP <br />86003A and 8G003D. <br />Fine assessment: $360.00 <br />Termination: February 4, 1998 <br />Dale: September 12, 1997 <br />Agency: Montana Depazmtem of Enviromtental Quality <br />Violation: No. 97-03-02: Soiled and seeded a drainage channel prior to submitting a drainage <br />channel design, and prior to Departmental iospecdon and approval of dte regraded <br />channel. <br />Abatement: Submit chatutel desigtt of sailed reaches of Drainage 004 by August 30, 1998 and install <br />silt fence by Jtily 5, 1998. <br />Fine assessment: $240.00 (Pending). <br />Termination: (Pending) <br />2.03-4 (Permit Renewal dteVtSien 3/27/00) <br />PAN -03 ~ <br />