Laserfiche WebLink
iii iiiiiiiiniu iii <br />999 <br />E~~A <br />S Coal Company Seneca Coal Company <br />RECEIVED <br />JUL 261999 <br />Division a Me~erals 8 Gedo(Or <br />July 20, 1999 <br />Mr. Michael Boulay <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203-2273 <br />RE: Quarterly Sedimentatioa Pond Inspections - Yoast Miae <br />Dear Mr. Boulay: <br />Enclosed is the second quarter inspection reports for Ponds 010 <br />and 011 at the Yoast Mine. Conditions appeared stable and <br />acceptable. <br />If you have any questions, please call me. ®~~-.~ <br />7~'l~ <br />Altay~~'a, P.E. <br />Enclosure(s) <br />c: Dennis Jones (SCC) <br />Seneca Coal Company • P.O. Drawer D • Hayden, Colorado 81639 <br />Telephone (970) 276-3707 • FAX (970) 276-3014 <br />