Laserfiche WebLink
Sampling Sampling <br /> Location Date Time <br /> North Thompson <br /> Upstream 10-29-84 10:22 a.m. <br /> North Thompson <br />' Downstream 10-29-84 12:00 p.m. <br /> Roaring Fork • <br /> Upstream 10-31-84 9:30 a.m. <br /> Roaring fork <br /> Downstream 10-31-84 10:30 a.m. <br /> Middle Thompsor, <br /> Upstream 10-25-84 11:22 a.m. <br /> Middle Thompson <br /> Downstream 10-25-84 10:52 a.m. <br /> • <br />MONTHLY SURFACE MATER MEASUREMENTS <br />SNOWMASS COAL COMPANY <br />NORTH THOMPSON CREEK MINES <br />PH Temperature Conductivity Flow Rate <br />(nearest 0.1) (°C) (Umhos @ 25°C) cfs <br />6.9 -0.8°C 77 4.85 <br />7.6 1.8°C 175 5.26 <br />8.2 8.6°C 360 -- <br />8.2 8.8°C 450 -- <br />7.7 -1.5°C 65 3.76 <br />7.8 ~-1.1°C 81 5.97 <br />• ~ • :. <br />