Laserfiche WebLink
Blue Mountain Energy, Inc. - Deserado Mine <br />Quarterly Sediment Pond Inspection Report <br />Second Quarter 2005 <br />Onerationa] Status <br />Inspector: Scott Wanstedt -Environmental Engineer <br /> Type of Approx Sediment Outflow H2O Samp. <br /># Ponds Name Descri lion Date HZO Level % Level % Yes No Yes No Comments <br />1 Sed Ponds DP-1 D-Portal 6/30 90 35 X X <br />2 RP-1 Refuse Area 1 6/30 0 10 X X <br />3 RP-2/3 Refuse Area 2/3 6/30 20 15 X X <br />4 RP-4 RefuseArea4 6/30 25 11 X X <br />5 RP-5 Refuse Area SA 6/30 25 12 X X <br />6 RR-1 Railroad Fill Slope Pond 1 6/30 0 5 X X <br />9 SS-1 Slot Stomge Building Access Road Pond 6/30 25 20 X X <br />10 SS-2 Slot Stomge Blding Emerg. Coal Stomge Area Pond 6/30 0 5 X X <br />11 HSL-1 Halandras Sanitary Land Fill Pond 6/30 0 5 X X <br />12 SDH-2U Down Hole Sump Upper Influent Pond inactive inactive 5 X X Shut off 2/96 due to mine sealing <br />13 SDH-2L Down Hole Sump Lower Effluent Pond inactive inactive 5 X X Shut off 2/96 due to mine sealing <br />14 SDH-3/5 Down Hole Sump Discharge 2 inactive inactive 10 X X Shut off 2/96 due to mine sealing <br />16 TS-1 Transfer Building 1 6/30 0 10 X X <br />17 TS-2 Transfer Building 2 6/30 0 I S X X <br />18 TS-2a Temp Coal Stomge by Transfer 2 6/30 0 5 X X <br />19 Proc Pond PP-1 Prep Plant Process Pond 6/30 35 45 X X <br />20 PP-2 Prep Plant Process Pond 6/30 50 35 X X <br />21 RW-1 Raw Water Lagoon @ White River 6/30 100 20 X X Freshwater storage pumped from river <br />~. <br />