Laserfiche WebLink
COLORADO DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT, Water Quality Control Division <br />' Rationale -Page 7, Permit No. CO-0038342 <br />a. Anew permit rs issued where the discharge was not in existence at the time of the classification and standards <br />rulemaking, or <br />b. In the case ofa continuing discharge, additional information or factors have emerged that were not anticipated or <br />considered at the time of the classification and standards rulemala'ng." <br />The evaluation for this permit shows that the Water Quality Control Commission, during their proceedings to adopt the <br />Classifications and Numeric Standards for Lower Colorado River Basin, considered economic reasonableness. <br />Fusthermore, this is not a new discharger and no new information has been presented regarding the class cations and <br />standards. Therefore, the water qualirystandard-based effluent limitations of this permil are determined to be <br />reasonably related to the economic, environmental, public health and energy impacts to the public and affected persons <br />and are in furtherance of the policies set forth in Sections 25-8-102 and 104. If the permittee disagrees with this finding, <br />pursuant to 61.11(b)(ii) of the Colorado Discharge Permit System Regulations, the permittee should submit all pertinent <br />information to the Division during the public notice period. <br />B. Monitoring <br />1. Effluent Monitoring: Effluent monitoring wil! be required as shown in Tables VI-4 and VI-5. Refer to the permit far <br />locations of monitoring points. <br />Table VI-4 -Monitoring Requirements - Outfa[l 001 <br />;~aiameter' _ _:a_.. _ .. -.":- _. >.. ~~ ., MegsurementrFiertuenep '.,' ~.Sdmple Type, _. w , :'. <br />Flow,MGD Once erweek Instantaneous or Continuous <br />TSS, mg/! Once er month Grab <br />H, s.u. Once erweek In-Situ <br />Oil and Grease, m /1 Once erweek Visual <br />TDS, m /1 Once er uarter Grab <br />Settleable Solids, ml/1 Once ermonth Grab <br />Iron, Total, u /1 Once ermonth Grab <br />Table VI 5 MonttortnR Requtrements Out[[ 002 <br />Pgrdii eter ~,;,~,,, ..~Med"sirernerz ency ~_ S6mpte Type <br />Flow, MGD Weekl Instantaneous or Continuous <br />TSS, mg/l Monthly Grab <br />H, s.u. Weekly In-situ <br />Oil and Grease, mg/l Weekly Visual <br />TDS, mg/1 Quarterly Grab <br />WET, Chronic Quarterly 3 Composites/Test <br />Iron, Total, u /1 Monthly Grab <br />Monitoring requirements are based on the previous permit. <br />2. Additional MonitorinP: As described in section VLA.2.d.i., a 12-time analysis for total recoverable (TR) arsenic, <br />potentially dissolved (PD) cadmium, TR trivalent chromium, PD copper, TR iron, PD lead, PD manganese, total <br />mercury, PD nickel, PD selenium, PD silver, and PD zirsc, is needed for ou all 002. The first sampling shall occur <br />during the first month after the permit becomes effective (or upon commencement of discharge) and sampling shall <br />continue for the next eleven consecutive months. If no discharge occurs during the month, sampling shall resume when <br />discharge resumes and continue until twelve samples have been collected and analyzed using approved methods with <br />method detection limits as low or lower than those specified in Part LE.3. of the permit. <br />C. Reporting <br />1. Discharge MonttorinP Report: Central Appalachia Mining, LLC shall submit Discharge Monitoring Reports (DMRs) on <br />a monthly basis to the Division. The Division now requires all permittees to submit DMRs monthly. These reports shall <br />Last Revisrd: 6/9/2004 <br />