My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO21964
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO21964
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:43:08 PM
Creation date
11/20/2007 2:38:24 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Hydrology
Doc Date
5/4/1994
Doc Name
MEMO COLOWYO MINE C-81-019 WASHBAY POND & SEDIMENT SUMP CONSTRUCTION CERTIFICATIONS
From
DMG
To
JANET BINNS
Permit Index Doc Type
PROF POND CERTIFICATIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-2- <br />All volumes in Table 1 were calculated by a block model method. <br />Attached for your review is Colowyo's computer generated block model and printout <br />of volumetrics. <br />You wild note from Figure 3 that a bentonite mix was incorporated into <br />construction in_certain locations. Bentonite was added to the bottom of the key <br />cut due to intercepting wet and soft conditions at the bottom. Bentonite was <br />added along the inside face of the dam up to the elevation of the dewatering <br />device to ensure a tight seal along the face where water would likely occupy <br />volume on a frequent basis. <br />At the request of the Division, several compaction tests were run. <br />The results of the tests indicated the structure was compacted well beyond the <br />required minimum of 90%. The face of the outslope of the dam was rip rapped to <br />prevent any potential flood water erosion by Good Spring Creek'. ' <br />The access road into the pond was constructed with gravel laid down in <br />one 0.5 foot lift. The construction traffic beat the gravel into the ground to <br />approximately ground level. In the event Goad Spring Creek rises out of its <br />bank, the access road into Gulch A Pond will not impound sheet,, flow produced by <br />Good Spring Creek. <br />If you have any questions, or require additional information far, Gulch <br />A Pond, please call at your convenience. <br />Sincerely, <br />COLOWYO COAL COMPANY <br />Y <br />i <br />~" <br />Ed Moyer ~ <br />Geologist/Reclamation Specialist <br />ETM/yml <br />Enclosures <br />cc: R.G. Atkinson <br />J.A. Kiger <br />Central Files <br />
The URL can be used to link to this page
Your browser does not support the video tag.