Laserfiche WebLink
<br />BASIN RESOURCES, INC. <br />SEDIMENTATION POND INSPECTION FORM <br />~ ~ 005 ~~ <br />Pond NEW ELK NPDES No. <br />Date of Inapection(~ s c f M (.~ C 2 1 2~, /~i 9s <br />EMBANKMENT ". <br />1. Adequacy of the vegetative cover: xcsllen Moderate, Few, Poor <br />2. Erosion lorminq gullies: Eztensive, Some, Very Few, on <br />3. Is wave action causing erosion: <br />On the upstream embanlanent? Yes No X <br />At the principal spillway inlet? Yee No~_ <br />4. Erosion of the downstream toe of Lhe embankment? Yee No,,,~_ <br />The cause of the erosion is attributed to: <br />5. is seepage occurring through tha dam? Yea No_~_ If yea <br />could this seepage cause potential instability? Yea No~_ <br />Explain: <br />PRINCIPAL SPILLMAY <br />1. Is the principal spillway systea in working order? Yes~_lfo <br />2. Is the inlet free of debris and restrictive material?Yes~_No <br />3. Ia the discharge outlet free of restrictive material? Yes~No_ <br />• 4. Is erosion occurring at the discharge outlet? Yes No_ (,~,_If <br />Yes. <br />;. evaluate the severity: Extensive. tolerate Just starting None <br />'~' . . <br />EMERGENC SPILLMAY <br />1. Is the overall emergency spillway system capable of passing <br />design storm discharge? Yea~_No <br />pp g cy'spillway has discharged water <br />!' 2. Does it a ear as if the ewer en <br />since the lost inspection? Yes No~_ <br />3. Is erosion occurring at any section of the emergency spillway? <br />Yea No~~ Describe the • <br />.extent <br />" SEDIMENT STORAGE CAPACITY <br />. 1. Hae the design storage capacity of the. reservoir bean surpassed? <br />Yea No_,L I! yes, <br />t explein• ~ <br />~ 4",;:' Please.add any special consents concarninq potentially dangerous <br />problems on the beck of thi• sheet. <br />Inepector_1,.~2G4~rtw_c~t" ~ <br />