Laserfiche WebLink
• Reclamation Management Fee <br />This fee represents the cost Eor management of the entire project. Usually this is <br />performed by a firm specializing in reclamation oversight. This was estimated per Graph <br />3, OSMR2 Handbook a[ 3.8 percent of the direcC costs. <br />Public Liability Insurance <br />This insurance protects the Contractor against his legal liability to third persons for <br />bodily injury and property damage arising out of his own operations. This cost has been <br />es[imaced at 1.55 percent of Che direct costs. <br />Contractor's Performance Bond <br />The performance bond guarantees the contract will be performed and the reclamation will be <br />conducted to the satisfaction of the Division. This cost has been estimated at 1.05 <br />percent of the direct costs. <br />• <br />• <br />8 Revised 2/01 <br />