My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE50766
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE50766
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:55:09 PM
Creation date
11/20/2007 2:37:28 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082A
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
TAB 25 BONDING
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CLAMATION BOND CALCULATION -SUMMARY SHEET Part 2 of 2 <br />• <br /> Dredge Sediment Ponds = $261,471 <br /> Grade Diversion Ditches = $2,610 <br /> Reclaim Stocktanks = $12,616 <br /> Remove Flumes = $2,473 <br /> Seal Drill Holes & Monitor Wells = $11,999 <br /> Rip Explosive Storage Area = $1,327 <br /> Rip Final Graded Area = $7,173 <br /> Reclaim Light-Use Roads = $24,002 <br /> Reclaim 650 Deadhead Roads = $10,998 <br /> Remove Debris = $15,527 <br /> Total Facilities = $703,437 <br /> Miscellaneous Items <br /> Spoil Sampling = $5,515 <br /> Light Plants and Support Equipment = $7,395 <br /> Terrace Construction = $10,115 <br /> Repair Rills and Maintain Roads = $78,620 <br /> Dispose of Hazardous Waste = $6,750 <br /> Dispose of Fuel Tank Sludge = $3,900 <br /> Haul Coal and Slack Piles to Pit = $10,931 <br />• Total Miscellaneous = $123,226 <br /> TOTAL DIRECT COSTS = $3,585,454 <br /> INDIRECT COSTS <br /> Mobilization and Demobilization <br /> (5% of Direct Costs) _ $179,273 <br /> Engineering Redesign Fee <br /> (4.9% of Direct Costs) _ $175,687 <br /> Contractor Profit and Overhead <br /> (7.3% of Direct Costs) _ $261,738 <br /> Reclamation Management Fee <br /> (3.6% of Direct Costs) _ $136,247 <br /> Public Liability Insurance <br /> (1.55% of Direct Costs) _ $55,575 <br /> Contractor's Performance Bond <br /> (1.05% of Direct Costs) _ $37,647 <br />• TOTAL INDIRECT COSTS = $846,167 <br />TOTAL RECLAMATION LIABILITY = $4,431,621 <br />10 Revised 2/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.