<br /> <br />EXHIBIT D - MINTN PT,AN N RRATT ( ONTI ED1 <br />(Revised 02/07/95) <br />In the event some of the material is transported directly from the <br />site by truck, the primary haul route for transport of material <br />from the site will be 88th Avenue and Monaco Street to I-76 for use <br />in other parts of the metropolitan area. Other routes may also be <br />used for local deliveries and destinations northwest and north. <br />The operation will normally operate from 6:00 A.M until 10:00 P.M. <br />six days a week, although extended hours and work on Sundays and <br />Holidays may occur during extremely busy periods. Hauling would be <br />allowed between the. hours of 6:00 A.M. to 6:00 P.M. Monday through <br />Friday and 8:00 A.M. to 5:00 P.M. on Saturday, unless longer hours <br />are granted by Commerce City, which is the local government with <br />jurisdiction. <br />To summarize, the Mining Areas are as follows: <br />Area 1 - 5 Acres <br />Area 2A - 50 Acres <br />Area 2B - 91 Acres <br />Area 2C - ~Q Acres <br /> Total 180± Acres <br />A summary of how each area will be mined is as follows: <br />Area 1 - This area will be wet mined, and backfilled with sand <br />spoils from this area and other mining areas of the <br />property. There will be no import of material for <br />backfilling from out of the permit area. Approximately <br />8,000 cubic yards of topsoil/overburden will be stored <br />and temporarily revegetated in the 25' setback area along <br />the east side of this area and the south side of Area 2B <br />for later permanent revegetation. No mining into the <br />water table will be undertaken, until a temporary <br />augmentation plan has been approved. <br />